Step Gold — Gold Mine Power Supply EPC Project
- Category: EPC SCADA Switchgear Transformers
- Client: Step Gold LLC
- Duration: 2024
A complete EPC (Engineering, Procurement, Construction) project for the 6/0.4 kV electrical infrastructure of a gold mine in Tsagaan-Ovoo soum, Dornod province was successfully implemented.
All stages from licensing to testing, commissioning, and state commission handover were performed in-house, including:
• Engineering design, load calculations, and expert approval
• 6 kV substation supply and installation
• 6 kV cable line and joint supply and installation
• 6/0.4 kV transformer supply and installation
• 0.4 kV distribution switchgear supply and installation
• 0.4 kV cable line supply and installation
• 6 kV substation relay protection and SCADA system supply and installation
• Meter supply and installation
• Earthing and lightning protection supply and installation
• Testing, commissioning, and state commission handover
This complete EPC project established reliable and uninterrupted power supply for mine operations.